About the Site

The Method manufacturing facility is a 170,000 SF industrial building situated on a 15-acre brownfield site in the Pullman Park Development on the South Side of Chicago. To support the development, a 2,500 LF private road was constructed. Emphasizing sustainability. the project integrated advanced stormwater management and green technology, earning the facility LEED Platinum certification.

Our Contributions

• Site Evaluation/Feasibility Studies
• Site Planning Assistance
• ALTA/Boundary Survey
• Topographic Survey
• Preliminary Engineering Plans
• Final Engineering Plans
• Stormwater Management Design
• SWPPP
• Easement & Vacation Plats
• Plats of Subdivision & Consolidation
• Record Drawings
• Bidding & Preconstruction Services
• Construction Observation
• Resident Engineering Services

_DSF5097

Interested in Working With Spaceco?